Agilent Technologies N5230C Guide de l'utilisateur Page 43

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 54
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 42
User’s Guide U3025-90001 37
U3025AE10 Operational Check Procedures
10.Compare the Reflection Tracking (1,1) trace to the appropriate limits in Table 9 on
page 32. This can be done using Limit Lines, select Marker/Analysis > Analysis > Limit
Test > Limit Test ON and Limit Line ON > Global pass/fail display ON, select Show
Table . The trace should be above the limit. PASS will be displayed on the screen if the
limit lines are used.
11.Repeat step 9 and step 10 for Cal Sets “999.1” thru “999.12” (12-Port).
NOTE For Ports 3-12 the response from 10 MHz to 500 MHz is normal due to the
PNA-X Couplers in comparison to the U3022AE10 bridges. The bridges have
more gain in the coupled RF path.
Vue de la page 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 53 54

Commentaires sur ces manuels

Pas de commentaire