8510XF Network Analyzer Systems 2-15
Installation
Unpacking the System
Figure 2-7 Replacing the Anchor Bolt
Unload the system
1. Pull out the two bolts (item A) from the base using a screwdriver or
pliers. See Figure 2-5 on page 2-14.
2. Remove the brace assembly (item B).
3. Lift the hinged slat (item C) and remove the ramp anchor bolt (item D).
See Figure 2-6 on page 2-14.
4. Place one end of the ramp on the ramp ledge. See Figure 2-7 above.
5. Insert the ramp anchor bolt and fold down the hinged slat. To secure the
ramp, you may place long wood screws through the ramp and into the
ramp edge.
6. Fold down the ramp’s end flap (item E).
WARNING A racked system is tall and top-heavy. It is easy to tip the rack over while
movingit, whichcouldresultinpersonalinjuryordeath. Unloading the system
safely requires the participation of four persons, and they must exercise care
to prevent the rack from tipping over.
Ramp anchor bolt (Item D)
(hinged to ramp) (Item E)
Ramp end flap