Agilent Technologies 1100 Series Manuel de service Page 23

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 318
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 22
1100 Series DAD and MWD Reference Manual 23
Installing the Detector 1
4 Connect the power cable to the power connector at the rear of the detector.
5 Connect the CAN cable to other Agilent 1100 Series modules.
6 If a Agilent ChemStation is the controller, connect either
the GPIB cable to the detector or
the LAN connection to the LAN interface board in the detector.
7 Connect the analog cable(s) (optional).
8 Connect the APG remote cable (optional) for non-Agilent 1100 Series
instruments.
9 Turn on power by pushing the button at the lower left hand side of the
detector. The status LED should be green.
Figure 5 Front View of Detector
Line power switch
with green light
Status indicator
green/yellow/red
NOTE
If a Agilent 1100 DAD/MWD/FLD is in the system, the LAN/GPIB should be connected to
the DAD/MWD/FLD (due to higher data load).
Vue de la page 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 317 318

Commentaires sur ces manuels

Pas de commentaire